The owner or operator of a boiler shall prepare a boiler for an internal inspection and hydrostatic test not less than how many days after notification by the inspector?
The owner or operator of a boiler shall prepare a boiler for an internal inspection and hydrostatic test not less than how many days after notification by the inspector?