A CONTRACTOR MUST ESTIMATE THE COST OF REBAR FOR A BRIDGE PROJECT. if #6 REBAR WEIGHS 1.502 POUNDS PER LINEAR FOOT AND COST .49 CENTS PER LINEAR FOOT, THE TOTAL COST PER TON IS APPROXIMATELY:

A CONTRACTOR MUST ESTIMATE THE COST OF REBAR FOR A BRIDGE PROJECT. if #6 REBAR WEIGHS 1.502 POUNDS PER LINEAR FOOT AND COST .49 CENTS PER LINEAR FOOT, THE TOTAL COST PER TON IS APPROXIMATELY: