During a slump test, the concrete batch shows a 4″ slump. Specifications call for 6″ slump. If the water to cement ratio cannot be adjusted, what can be done?
During a slump test, the concrete batch shows a 4″ slump. Specifications call for 6″ slump. If the water to cement ratio cannot be adjusted, what can be done?