Given: The projected roof area of a building is 4,600 square feet. The maximum rainfall is 4 inches. The rain leader pipe, according to Code, should be no less than ___ inches.
Given: The projected roof area of a building is 4,600 square feet. The maximum rainfall is 4 inches. The rain leader pipe, according to Code, should be no less than ___ inches.