Refer to the Diagram; A footing will be poured that is 1’6″ wide and 2′ deep with the exception of the North wall which will be 2′ wide and 2 ‘ deep. How many cubic yards of concrete will be needed?

Refer to the Diagram; A footing will be poured that is 1’6″ wide and 2′ deep with the exception of the North wall which will be 2′ wide and 2 ‘ deep. How many cubic yards of concrete will be needed?