Refer to the meter box plan and section. If concrete costs $40.00 per cubic yard, the total cost for all thrust restraints required for the MU fittings is between ____. Do NOT add for sales tax.
Refer to the meter box plan and section. If concrete costs $40.00 per cubic yard, the total cost for all thrust restraints required for the MU fittings is between ____. Do NOT add for sales tax.