A contractor is preparing a seed bed for an AIP funded airport. What is the required minimum number of inches of loose friable material if the soil is prepared immediately before seeding?
A contractor is preparing a seed bed for an AIP funded airport. What is the required minimum number of inches of loose friable material if the soil is prepared immediately before seeding?