A natural stream protected by federal regulations is planned for incorporation into a golf course design. The contractor is responsible for errosion control during the construction process. Which of the following requires a permit for errrosion and sediment control when specified in a pollution prevention plan?

A natural stream protected by federal regulations is planned for incorporation into a golf course design. The contractor is responsible for errosion control during the construction process. Which of the following requires a permit for errrosion and sediment control when specified in a pollution prevention plan?