Cleanouts shall be installed at each change of direction of the drainage system greater than 45 degrees, except not more than one shall be required every ___ feet.

Cleanouts shall be installed at each change of direction of the drainage system greater than 45 degrees, except not more than one shall be required every ___ feet.