Site Requirements: Drainage – the site must have the capability to control and/or contain run-off from the maximum rainfall in 24 hours from a 25-year storm (when maximum rainfall records are not available).

Site Requirements: Drainage – the site must have the capability to control and/or contain run-off from the maximum rainfall in 24 hours from a 25-year storm (when maximum rainfall records are not available).